Concept · For district heating plants

Wind energy directly into the heating network

An off-grid system in which a wind turbine and a heat pump deliver heat directly to the district heating network, without the energy passing through the power grid.

  1. WindMechanical energy
  2. Heat pumpDirectly coupled
  3. Heat storageHot water is stored
  4. Heating networkHeat for the town

Background

Today, wind energy reaches district heating via the power grid

Wind power for district heating currently runs through the electricity grid, with everything that involves: waiting for a grid connection, paying tariffs and levies that end up in the price of heat, and meeting the grid's technical requirements.

  1. Step A

    Wind turbine

    produces electricity, which is sent out on the power grid

  2. Step B · Bottleneck

    Power grid

    • Grid connection and waiting time
    • Tariffs and levies
    • Grid compliance requirements
  3. Step C

    Heating plant

    buys the electricity back and converts it into heat

Every detour costs time, money and capacity on the grid.

Principle

Turbine and heat pump: one system, no power grid

The heat pump draws its heat from air, ground, geothermal sources, seawater, waste heat or wastewater, depending on what is available on site. The wind turbine and the heat pump are one integrated system: the turbine drives the heat pump directly. Hot water goes through a heat store to the heating plant and on to homes and industry. The heat pump can also supply industry directly.

Wind turbine and heat pump as one system. The heat pump draws on air, ground, geothermal heat, seawater, waste heat or wastewater. Hot water goes through a heat store to the heating plant and on to homes and industry. The heat pump can also supply industry directly. No connection to the power grid.AIRGROUNDGEOTHERMALSEAWATERWASTE HEATWASTEWATERHEAT PUMPWIND TURBINEHEAT STORAGEHot waterHEATING PLANTHOMESINDUSTRYINDUSTRYPOWER GRIDNOT CONNECTED
There is no connection to the power grid. Swipe to see the whole diagram.

Benefits

No grid, no grid requirements, with its own heat storage

  1. 1

    Puts no load on the power grid

    The energy goes directly from turbine to heating network. No grid connection and no competition for capacity.

  2. 2

    Energy is stored as hot water

    Production and consumption are decoupled. The heat store evens out variations in the wind.

  3. 3

    No grid compliance requirements

    The system is designed for off-grid operation. This can simplify the turbine and potentially reduce the capital cost.

  4. 4

    Proven components

    Known technology, combined in a new system architecture that has not been seen before.

  5. 5

    No grid tariffs or levies

    The energy never passes through the power grid, so grid tariffs and electricity tax on the power fall away.

  6. 6

    Lower energy losses

    The turbine drives the heat pump directly, with no conversion to electricity and back. Fewer steps mean fewer losses.

The wind's energy becomes heat in your network without passing through the power grid.

Storage

The heat store evens out the wind

When the wind blows, the heat store is charged. When it is calm, the network is supplied from the store.

Heating plants already know accumulation tanks. What is new is that the wind's energy goes straight into the tank, without first being turned into electricity on the grid. The store bridges the gap between when the wind blows and when the town needs heat.

Technology

Proven components, low technological risk

None of the parts is new technology. What is unique is the coupling, developed by engineers with experience from both wind turbines and heat pumps.

Component

Wind turbine

Well known and reliable

Component

Heat pump

Mature technology in district heating

Component

Heat storage

Accumulation tanks you already know

System

Off-grid wind heat

A coupling not seen before

The technological risk is not in the components; they are proven. What is new is the way they are coupled.

Next step

Become the first heating plant with off-grid wind heat

We are looking for heating plants that want to join from the start, as pilot and technical sparring partner.

Book a no-obligation meeting
  1. Step 1No-obligation meeting
  2. Step 2Technical assessment of your plant
  3. Step 3Pilot project